Installation of multi-site bus washing area
Many public (and also private) transport customers entrusted MONTANIER with the design and construction of walkway washing tunnels (1 min to 1 min30 per wash cycle).
These wash areas are complemented by a high-speed low-pressure chassis lava.
They are considered highly effective.
Finally, a water treatment system is used to power the washing tunnel and the lava chassis in recycled water, making the stations almost self-sufficient in water. The ultimate goal is water autonomy (no consumption), and zero discharge.